Testimonials

Michael Price, Director, Holborn Group

“I have to say, Keith is an absolutely delightful chap, who took time to induct us, give us a factory walk round and provide invaluable technical support on any questions we threw at him. Whilst I appreciate that this is his job, he comes over as such an articulate engineer who is clearly proud of the product he works on and the job and organisation he works for.

Hopefully you can pass these plaudits onto him and Martin, as well as being aware of what great engineers you have on your hands!”

John Duquemin, Chief Engineer, Jersey Electricity plc

“Thanks to Slaters stock and timely engineering, the 22MW Diesel project was able to deliver flexible, efficient power to the customers in Jersey before the cold weather set in.”

Brian Comley, Spear Electrical Ltd

“It is always a pleasure dealing with Slaters, everyone we speak to goes out of their way to do what they say they will and once again you have helped us and in-turn our client, it’s much appreciated.”

Steve Ambridge, Humber Energy Ltd

“I would like to take the opportunity to personnally thank you for the excellent service provided to us with regards to the replacement transformer. I was amazed that during a 24 hour period we started with a failed transformer and full site shutdown and ended with a new transformer and could start to get back online.”

Keith Jenkin, Humber Energy Ltd

“Many thanks and congratulations for the help, level of support and achievement provided on the 8th / 9th July. I have been advised of the professionalism, skill and high level of organisation provided by your company to replace the 11kV/415 transformer within 24 hours of the unplanned failure.”

Arqiva

“I would like to take this opportunity to thank you and your team on a splendid job at Crystal Palace”

Tata Steel

“Slaters provided us with a first class service”

Shepherd Engineering Services Ltd

“We and several other parties around the site were very impressed with the work Slaters Electricals carried out on the Manchester Hospital project, getting the Duel Distribution Board built, dispatched and installed on time. We will definitely be back to SEL in the future for this and other projects”.

Melton Power Services Limited

“The Slaters Electricals service was excellent, please pass my thanks onto all involved with the exceedingly quick turnaround. This helped us complete the project we were involved with in advance of time for the customer, even after a failure of one of his VCBs, which painted both SEL and MPS in an exceedingly good light

Will definitely keep in touch and look to use you again on further MV and LV works where possible”

Peter Grant Papers Ltd

“Just note to say thank you, the LV panel and transformer are now installed and up and running.

Our engineers all commented on the assistance and responsiveness when requesting information and efficiency of the guys doing the installation on Sunday, even when it did not go completely to plan”

Distgen

“I just wanted to send a quick note to notify you of my experience in my recent purchase of the two transformers from Slaters. Basically all aspects of the experience was excellent:

• You guys were a pleasure to deal with; responsive and flexible
• Once purchase was committed to, liaison over delivery was first rate
• Delivery happened exactly as it was supposed to

So, thanks very much. Next time I need electrical switchgear or transformer stuff, I will be coming to Slaters first.”